Jump to content

Massachusetts Turnpike

Route map:
From Wikipedia, the free encyclopedia

Massachusetts Turnpike marker Massachusetts Turnpike marker
Massachusetts Turnpike
Interstate 90
Map
Massachusetts Turnpike highlighted in green
Route information
Maintained by MassDOT
Length138.1 mi[1] (222.3 km)
Existed1957–present
HistoryBoston Extension added in 1965, and Ted Williams Tunnel in 2003
Component
highways
  • I-90 entire length
RestrictionsNo hazardous goods and cargo tankers east of exit 131[2]
Major junctions
West end
Major intersections
East end Route 1A in Boston
Location
CountryUnited States
StateMassachusetts
CountiesBerkshire, Hampden, Worcester, Middlesex, Suffolk
Highway system
Route 88I-90 I-91

The Massachusetts Turnpike (colloquially the "Mass Pike" or "the Pike")[3] is a controlled-access toll highway in the US state of Massachusetts that is maintained by the Massachusetts Department of Transportation (MassDOT). It is concurrent with the entirety of Interstate 90 (I-90) within the state, and is the longest Interstate Highway in Massachusetts, spanning 138 miles (222 km) along an east–west axis.

The turnpike opened in 1957, and it was designated as part of the Interstate Highway System in 1959. It begins at the New York state line in West Stockbridge, linking with the Berkshire Connector portion of the New York State Thruway. The original western terminus of the turnpike was located at Route 102 in West Stockbridge before I-90 had been completed in New York state. The turnpike intersects with several Interstate Highways as it traverses the state, including I-91 in West Springfield; I-291 in Chicopee; I-84 in Sturbridge; the junction of I-290 and I-395 in Auburn; and I-495 in Hopkinton. The eastern terminus of the turnpike was originally at I-95 in Weston, it has been extended several times: to Allston in 1964, to the Central Artery (designated as I-93, US Route 1 (US 1), and Route 3) in Downtown Boston in 1965, and to East Boston as a route to Logan International Airport in 2003 as part of the "Big Dig" megaproject. There are two auxiliary Interstate Highways in Massachusetts for I-90, those being I-190 and I-290.

The turnpike was maintained by the Massachusetts Turnpike Authority (MTA) until the department was replaced by the Highway Division of MassDOT in 2009. The implementation and removal of tolls in some stretches of the turnpike have been controversial; travel between most, but not all, exits requires payment. The Fast Lane electronic toll collection system was introduced alongside cash payment in 1998; it was later folded into the E-ZPass branding in 2012. The original toll booths were demolished and replaced by toll gantries with the transition to open road tolling in 2016, which replaced cash payment with "pay-by-plate" billing.

Route description

[edit]

The Massachusetts Turnpike is informally divided into two sections by MassDOT: the original 123-mile (198 km) "Western Turnpike" extending from the New York state border through the interchange with I-95 and Route 128 at exit 123 in Weston, and the 15-mile (24 km) "Boston Extension" that continues beyond exit 123 through Boston.[4] It is a four-lane highway from the New York state border through its interchange with I-84 at exit 78 in Sturbridge; it expands to six lanes beyond this interchange and briefly travels with eight lanes from exit 127 in Newton through exit 133 by the Prudential Center in Boston.[4] The 0.75-mile (1.21 km) underwater section of the Ted Williams Tunnel, which carries the turnpike under Boston Harbor to its eastern terminus at Route 1A by Logan International Airport, is reduced to four lanes.[5] The turnpike is the longest Interstate Highway in Massachusetts,[6] while I-90 in full (which begins nationally in Seattle, Washington) is the longest Interstate Highway in the United States.[7]

Western Turnpike

[edit]
Approaching the former West Stockbridge toll plaza traveling eastbound, January 2008
The "Weston tolls" that separated the Western Turnpike from the Boston Extension, October 2006

In the west, the turnpike begins in Berkshire County at the Massachusetts state line in West Stockbridge, where I-90 (routed through the Berkshire Connector portion of the New York State Thruway) enters from Canaan, New York.[8] Most toll plazas were located on the entrance/exit ramps before entering the turnpike itself. An exception was the mainline West Stockbridge toll plaza, designed for toll collection from inbound traffic from New York; it existed shortly after exit 3, an eastbound-only entrance and westbound-only exit in Massachusetts.[9] The turnpike crosses the Williams River later in West Stockbridge and passes over the Housatonic River in Lee.[10] The 30-mile (48 km) gap between exit 10 to US 20 in Lee and exit 41 to US 202 and Route 10 in Westfield (the first in Hampden County) is the longest gap between exits on the entire length of I-90,[11] and the fifth-longest gap between exits in the entire Interstate Highway System.[12] The highest elevation on the turnpike exists in the Berkshires, reaching 1,724 feet (525 m) above sea level in Becket; this point is also the highest elevation on I-90 east of South Dakota.[13] Beyond the peak elevation and between the exits, an eastbound runaway truck ramp exists in Russell.[14]

After almost 50 miles (80 km) of relative ruralness, I-90 has an interchange that leads to the separate routes of I-91 and US 5 at exit 45 in West Springfield;[9] it passes over the Connecticut River before reaching Route 33 at exit 49 and I-291 at exit 51, both in Chicopee. The turnpike passes through Ludlow at exit 54 before crossing the Quaboag River to exit 63 in Palmer.[9][10] The turnpike first enters Worcester County in Sturbridge, where exit 78 serves as the eastern terminus of I-84.[15] In Auburn, exit 90 has a two-Interstate interchange with I-395 traveling southbound and I-290 traveling eastbound.[15] The Blackstone River flows underneath the turnpike in Millbury,[10] where it has an interchange with Route 146 and a second direct connection to US 20 at exit 94.[9] Entering Middlesex County in Hopkinton, it has an interchange with I-495 at exit 106.[9] The turnpike crosses the Sudbury River between exit 111 at Route 9 and exit 117 at Route 30, all located within Framingham.[10][9] The last connection with another Interstate Highway on the Western Turnpike is located in Weston, at the I-95 and Route 128 concurrency.[9] This multipiece interchange is collectively referred to as the "Weston tolls".[16] Before being renumbered exit 123 in both directions, exit 14 was an eastbound exit and westbound entrance, and exit 15 was a westbound exit and eastbound entrance; prior to demolition, a mainline toll plaza existed for through traffic.[9] Following the removal of the toll plazas, exit 15 was reconfigured into exit 15A (now exit 123A) for I-95 and Route 128, and exit 15B (now exit 123B) toward Route 30.[17] At this junction, the turnpike crosses over the Charles River.[10]

Boston Extension

[edit]
The eastern terminus of the turnpike in the state, and I-90 nationally, at Route 1A in Boston

The first exit of the Boston Extension, exit 125, is an eastbound entrance and westbound exit at Route 16 in Newton.[18] The turnpike enters Suffolk County in Boston before reaching the "Allston–Brighton tolls", depositing traffic toward the Boston neighborhoods of Allston and Brighton and the nearby city of Cambridge.[4] This exit is also used to access Soldiers Field Road, a surface parkway that provides local access through central Boston and parallels the Turnpike. Before being renumbered exit 131 in both directions, exit 18 was a left-hand eastbound exit and westbound entrance, and exit 20 was a westbound exit and eastbound entrance; a mainline toll plaza was previously placed in between them for through traffic and was classified as "exit 19".[18] Compensating for the sparsity of eastbound entrances and westbound exits in Back Bay and Downtown Boston, a westbound U-turn ramp heading eastbound was opened in Allston in 2007;[19] while unsigned with an exit number, it was recognized as exit 20A for administrative purposes.[4] Past the tolls, the turnpike reduces to six lanes, heads through the campus of Boston University and passes Fenway Park before crossing over the Muddy River as it approaches the city's central neighborhoods.[10]

Exit 133 and the now-closed Clarendon Street onramp are located within the Prudential Tunnel, which takes the turnpike underneath the Prudential Center;[20] the former is an eastbound exit towards the Prudential Center and Copley Square, while the latter is a westbound-only entrance from Clarendon Street.[18] Beyond the Prudential Tunnel, exit 134 is labeled as a singular exit traveling westbound, but splits into three ramps for eastbound travel; exit 134A is a left-hand exit toward South Station, while exits 134B and 134C are directed toward I-93 northbound and southbound, respectively.[18] The turnpike travels under the Fort Point Channel before reaching South Boston at exit 135,[18] after which it enters the Ted Williams Tunnel to pass beneath Boston Harbor.[21] Exit 137 to Logan International Airport is the sole exit within the Ted Williams Tunnel, before the turnpike exits the tunnel and meets its eastern terminus at Route 1A northbound toward Revere.[18]

Service plazas

[edit]
Location Direction mi (km) Services[22]
Lee Eastbound 8.5 (13.7)
Westbound
  • EV charging stations
  • Gulf
  • Gulf Express
  • McDonald's
Blandford Eastbound 29 (47)
  • Gulf
  • Gulf Express
  • McDonald's
Westbound
  • Gifford's Famous Ice Cream
  • Gulf
  • Gulf Express
  • Honey Dew Donuts
  • McDonald's
  • Original Pizza of Boston
Ludlow Eastbound 55.6 (89.5)
  • Gulf
  • Gulf Express
  • McDonald's
  • Original Pizza of Boston
Westbound
Charlton Eastbound 80.3 (129.2)
  • D'Angelo
  • Fresh City
  • Gifford's Famous Ice Cream
  • Gulf
  • Gulf Express
  • Izone
  • McDonald's
  • Papa Gino's
Westbound 83.8 (134.9)
  • Auntie Anne's
  • D'Angelo
  • Fresh City
  • Gulf
  • Gulf Express
  • Izone
  • McDonald's
  • Papa Gino's
Westborough Westbound 104.6 (168.3)
  • Auntie Anne's
  • Boston Market
  • Cheesy Street Grill
  • D'Angelo
  • Dunkin' Donuts
  • Fresh City
  • Gulf
  • Gulf Express
  • Papa Gino's
Framingham Westbound 114.4 (184.1)
  • Boston Market
  • Edy's Ice Cream
  • Fresh City
  • Gulf
  • Gulf Express
  • Honey Dew Donuts
  • Izone
  • McDonald's
  • Original Pizza of Boston
  • Starbucks
Natick Eastbound 117.6 (189.3)
  • Cheesy Street Grill
  • D'Angelo
  • Dunkin' Donuts
  • EV charging stations
  • E-ZPass MA walk-in service center
  • Gulf
  • Gulf Express
  • Izone
  • McDonald's
  • Papa Gino's
  • Registry of Motor Vehicles Express

Tolls

[edit]

As of 2009, toll revenue generated from the Massachusetts Turnpike is to be spent in the section in which it was collected, either the Western Turnpike or the Boston Extension (alternatively named the "Metropolitan Highway System" for administrative purposes).[23] Tolls from exit 3 (former exit 1) in West Stockbridge through exit 51 (former exit 6) in Chicopee were removed by then-Governor Bill Weld in 1996, following complaints that the tolls collected in Western Massachusetts were financing the Big Dig in Boston;[24] they were ultimately reinstated in October 2013.[25]

At the recommendation of former secretary of administration and finance Eric Kriss, who recommended that tolls be eliminated along the entire turnpike except for the tunnels leading to Logan International Airport,[26] the MTA voted to remove all tolls west of Route 128 in Weston in October 2006.[27] Members of the Massachusetts Legislature Transportation Committee cited the potential need to amend state law and the uncertainty of how the turnpike would be maintained as setbacks to the toll removal, which ultimately never came to fruition.[28]

In the November 9, 2006, edition of The Boston Globe, Governor Mitt Romney announced his intention to try to remove the tolls before his successor, Deval Patrick, was inaugurated in January 2007, but this did not occur. In 2008, Patrick announced a similar plan to remove most tolls west of I-95,[29] but this also did not occur before his term ended in January 2015. State law requires tolls to be removed west of Route 128 when its debt is paid and the road is in "good condition", but MassDOT plans to continue tolls after the bonds are paid off in January 2017, because the road will still need $135 million per year for repairs and maintenance.[30][needs update]

At a January 22, 2009, board meeting, the turnpike decided to stop charging a one-time $25.95 fee for the acquisition of a Fast Lane toll transponder, replacing it with a 50-cent monthly recurring service fee.[31] The implementation of the 50-cent monthly fee was canceled after long delays at toll plazas on Easter Sunday.[32][33]

Toll plazas

[edit]
Now-demolished toll plaza on an exit ramp, January 2016
Toll ticket used prior to conversion to open road tolling

The turnpike traditionally utilized the ticket system for toll collection; a driver would obtain a ticket from an onramp, which they would surrender to an offramp and pay a toll based on traveled distance.[34] While most toll plazas were located on the entrance/exit ramps by the turnpike, exceptions included the mainline toll plazas in West Stockbridge, Weston, and Allston–Brighton.[4] Electronic toll collection was introduced as an alternative to cash payment with Fast Lane transponders in 1998; when installed in the inner windshield of a vehicle, the equipment would be recognized automatically in special lanes at toll plazas and would withdraw the toll amount from the motorist's account.[35] It was first sponsored by BankBoston, and later FleetBoston Financial, before sponsorship was assumed by Citizens Bank in 2003.[36] Motorists were previously charged $27.50 (equivalent to $45.55 in 2023[37]) for the hardware itself,[36] although this fee has since been removed.[38] Citing federal highway regulations that prohibit sponsorship of toll plaza signage, the contract with Citizens Bank was not renewed upon expiration; the Fast Lane name was replaced with the E-ZPass branding, with which Fast Lane was interoperable, in 2012.[39]

Open road tolling

[edit]
Fare collection gantry in Newton

In 2014, Raytheon won a $130 million (equivalent to $165 million in 2023[37]) contract to convert the Massachusetts Turnpike to all-electronic open road tolling.[40] The stated goal of the change was to "make vehicle travel safer and more efficient".[41] Additional changes included the elimination of toll booth operators, as well as the demolition of existing toll plazas and reconfiguration of surrounding roadways.[30][42][43] Overhead gantries between most exits read E-ZPass transponders. Drivers without a transponder use pay-by-plate, having their license plate photographed and an invoice sent to the registered owner. This method of payment adds a $0.60 surcharge per invoice, with payment made online, or in cash at a local retail location.[44][45] Installation of gantries began in January 2016, and open road tolling began on October 28, 2016.[42] The inner segments of the toll booths were demolished 30 days after this date, which allowed traffic speeds to be raised. Complete demolition of toll booths and reconstruction was completed by the end of 2017.[42][46]

As there are no gantries between exits 45 and 54 (former exits 4 and 7) or between exits 90 and 96 (former exits 10 and 11), the Massachusetts Turnpike is essentially free between those pairs of exits. Otherwise, the transition to open road tolling is revenue neutral, meaning the tolls between any other pair of exits only saw small adjustments. Tolls are slightly higher for out-of-state residents without an E-ZPassMA transponder, and no-transponder tolls are higher.[47]

When all-electronic tolling went live on the Mass Pike, the Tobin Bridge, Callahan Tunnel, Sumner Tunnel, and Ted Williams Tunnel joined the system and were converted to charging a single toll in both directions, rather than a double toll in one direction. The Tobin Bridge was converted to all-electronic tolling for southbound only in July 2014.[42]

In addition to license plate information, the gantries also collect vehicle speed data; a MassDOT spokesperson said that the agency "will not be using the AET [all-electronic tolling] system to issue speeding violations".[48] Toll data is not a public record and is not subject to Freedom of Information Act requests, and MassDOT states that "All data collected will remain secure and kept confidential."[42] The data can be obtained by subpoena, however, and law enforcement will be able to specify license-plate numbers that will generate an immediate email if detected by the system.[49]

History

[edit]

Background and construction

[edit]
A map of the proposed highway put forth in the 1948 Massachusetts Highway Master Plan.
A map of the proposed highway put forth in the 1948 Massachusetts Highway Master Plan. These proposed roadways would become some of the state's most important transportation routes in the eastern portion of the state.

In the period following World War II, Boston had fallen into a deep period of stagnant growth. Its former maritime industries had closed as traffic in the harbor declined, the textile mills that had provided a large portion of the city's wealth had migrated out of the region seeking new locations that would allow them to maximize revenues, and property development had ground to a halt with virtually no new construction of any impact occurring since the beginning of the Great Depression.[50] Boston retail stalwarts such as Filene's and Jordan Marsh had decided to focus their energies and growth into the suburbs; Boston's citizens had begun to flee to the same suburban pastures as property taxes in the city skyrocketed. As U.S. News & World Report stated, Boston was "dying on the vine".[51]

After the end of the war, Massachusetts entered into a period of new highway projects planning that sought to help end the economic malaise the state was suffering from. It was in 1947 that Republican Governor Robert F. Bradford realized that the commonwealth needed to implement a standard framework to properly guide the planning and construction of these new roadways. He commissioned a study to produce a new Highway Master Plan for the eastern region, and, by 1948, it had been completed. Seeking the political benefits that a major public works project would bring, Bradford sent his plan to the Democratic-controlled Massachusetts General Court for approval; however, the Democrats sat on the project until their candidate, newly elected Democratic Governor Paul A. Dever, took office in January 1949.[52]

It was instead Dever who initiated the program to implement the Highway Master Plan for the city shortly after taking office in 1949. Enjoying a Democratic majority within the State House coupled with a Democratic governor for the first time in the commonwealth's history, he pushed through a series of highway bills with associated gas tax increases totaling over $400 million (equivalent to $3.69 billion in 2023[37]) between 1949 and 1952.[53] To oversee this undertaking, Dever brought in the former commissioner of the Massachusetts Department of Public Works, William F. Callahan, to once again head the agency he had helmed from 1934 to 1939. Known for his strong personality and drive to get projects completed,[53] Callahan immediately set out to construct three of the proposed highways (not including what would become I-495, which had been included in the 1947 plan): the "original outer" circumferential highway which became Route 128, the Southeast Expressway, and the Central Artery through the heart of the Boston's downtown. These three projects, totaling more than $92 million (equivalent to $986 million in 2023[37]), were seen as being essential to the growth of the city in the future. However, the construction of these roads took such a large portion of funds that the commonwealth was unable to provide funds for the Western Expressway project. However, before Callahan could oversee the completion of the southern leg of Route 128, he was appointed by Dever to run the newly formed MTA.[54][55]

Billboard advertising the construction of the turnpike, c. 1957, as seen in the documentary Building the Massachusetts Turnpike[56]

Because of the financial strain created by the bond issues used to construct these other highways, the commonwealth was unable to afford the costs of floating more bonds to fund the expenditures required to construct the Western Expressway along the Western Approach corridor of Boston. Callahan suggested creating a strong, independent, and semipublic transportation authority that could fund the new expressway by floating its own bond issues and financing them through tolls along the highway while having its own powers of eminent domain to secure the land needed to build it. Utilizing the political goodwill he accrued during his tenure as public works commissioner, primarily through extensive patronage hires,[53] Callahan was able to push his idea for the new authority through the State House with ease.[57] The authority was formed in early 1952, and, by 1955, it had issued the required bonds needed to construct a 123-mile (198 km) highway from the New York–Massachusetts border to the recently completed Route 128 in Weston. Despite being completed in 1957, many within the commonwealth quickly realized that the local routes used to get into Boston were still insufficient for the automotive traffic burdens placed upon them.[58]

Expansion into Boston

[edit]

While the highway construction boom proved to be fortunate for the suburban communities these new roadways passed through, the economy of Boston was still in a fragile state.[59] Realizing that Boston still needed to be connected to the turnpike to help reverse its flagging economy and reputation as a municipal has-been, Callahan was tasked in 1955 by the legislature to create an extension into the city designed to facilitate a turnaround of the city's fortunes. This new highway would connect the Massachusetts Turnpike to the heart of the city with a 12.3-mile (19.8 km) extension of the Interstate. It was his plan to bring the tolled turnpike from its terminus at Route 128 in West Newton into the city along the path of the Boston and Albany Railroad and connect it to the Southeast Expressway. This plan was in line with the 1948 Master Highway Plan for the city, which had always called for a Western Expressway to be built into the city. However, with the passage of the Federal-Aid Highway Act of 1956, the federal government provided sufficient funds to the states to construct new highways with a 90-percent subsidy, rendering the need for a toll road into the city obsolete.[60]

New York Central Railroad (Boston and Albany parent company) employee magazine Headlights from February 1965 showing an aerial photograph of the completed Boston Extension of the Massachusetts Turnpike

Complicating the matter, Callahan's planned extension route was not universally accepted by others within the state, such as newly elected Governor John A. Volpe and Newton Mayor Donald Gibbs, who sought to construct a freeway that would follow a different route between the Borders of Newton, Waltham, and Watertown along the Charles River and US 20 and be constructed using the funds now being provided by the Federal Highway Administration (FHWA).[61] Additionally, residents of the city of Newton, who would see significant demolition of neighborhoods within the city along with large portions of its central business district to make way for the turnpike extension, were adamantly against the proposed Boston and Albany routing of the road.[62] Newton, through the terms of two mayors, set about fighting the turnpike proposal through a series of increasingly futile legislative maneuvers in the General Court. Realizing that the needs and wants of the smaller city could not overcome the influence of Callahan within the state capitol, the smaller city would instead redirect its efforts to blocking the highway at the federal level through the Interstate Commerce Commission (ICC) and federal courts.[63] Affected property owners within Boston who were also looking at the possibility of losing their homes and business followed Newton's lead by filing a series of state and federal lawsuits that they hoped would derail the proposed extension.[64]

In the late 1950s, eminent domain takings for the Massachusetts Turnpike Extension into Boston devastated the historic Black-American community named "The Village". Compensation was offered for the homes below market value. Homeowners and renters confronted racial discrimination when trying to purchase or rent homes in Newton. Real estate agents would not work with them. They had to rely on word of mouth to find a new home. It is estimated that 50 percent left Newton as a result of the construction of the turnpike.[65]

Prudential Company

[edit]

Adding to Callahan's numerous problems with those in opposition to the new roadway, the Prudential Life Insurance Company announced that it was in the process of acquiring the 32-acre (13 ha) Boston and Albany Tremont Street railyard for the purpose of constructing a brand new building and associated complex to house its Northeastern American operations at about the same time as the commonwealth's plan to bypass the MTA was being announced. This proposed development stood square in the middle of the Boston leg of Callahan's planned turnpike extension and could possibly kill his proposed extension.[66][60] While many opponents within and outside the city looked upon the Prudential announcement as the possible final nail-in-the-coffin for Callahan's proposed toll road, Boston Redevelopment Authority (BRA) head Edward J. Logue saw Callahan's Prudential problem as a way to overcome issues the BRA was having in obtaining approval for the Prudential project from the city.[66][67]

Logue was in many ways the equal to Callahan: a driven man who sought the power to get things done as the head of a semiindependent authority whose structure had been modeled on Callahan's MTA.[66][68] Logue, who was responsible for many urban renewal projects in Boston at the time, including the construction of Storrow Drive and the West End redevelopment project, realized the Prudential project was essential to Boston's redevelopment efforts. The main issue holding up the project was a lack of consensus over tax breaks Prudential was demanding in order to move forward with the project.[69] Additionally, several legal decisions were handed down by the Massachusetts Supreme Judicial Court (SJC) questioning the constitutionality of the land takings required to build the complex.[66][70]

Adding to the problems associated with the Prudential project, during 1960 and 1961 there was a series of allegations made against Callahan claiming he had been engaging in illegal activities related to his second tenure as Public Works commissioner. These allegations included charges of financial kickbacks, bid rigging, and other questionable practices. This led to a corruption trial which threw a pall on his reputation that did not help with his drive to construct the turnpike extension. On top of the legal allegations, a group of three professors from the Massachusetts Institute of Technology and Harvard University made public allegations that the MTA had been using inflated numbers to push through its bond issues, thus artificially inflating their values. This led to failed series of bond issues that critics hoped would prevent the MTA from raising the needed funds for construction.[71]

It was in the midst of these many legal problems that, in April 1960, Prudential announced that continuation of their building project was contingent on direct highway access via a toll road along the Boston and Albany Railroad right-of-way.[66][71] Additionally, Prudential would lease air rights to the parcels from the MTA and purchase a large portion of bonds issued by the authority. Despite this agreement, Governor Volpe was still trying to nix the turnpike's plans along the Boston and Albany right-of-way, filing the city of Newton's request with the ICC to stop the construction of the roadway. It was only after a series of meetings between Volpe, Callahan, and Prudential executives that the governor was finally persuaded to withdraw the ICC filing and reluctantly support the toll road.[72] With the new deal in place, a not-guilty finding in the criminal case, and public relations pushback to the allegations of market tampering by the MTA, the bond measures were once again seen as a sound investment and investors quickly picked up the $175-million (equivalent to $1.38 billion in 2023[37]) bond issuance.[71][70] With the turnpike–Prudential agreement in place, Logue was able to petition the General Court to once again authorize a land taking deal and tax-deferment bill, which was passed rather quickly and signed by then-Governor Foster Furcolo. While this new bill was again deemed unconstitutional by the SJC, in its decision the General Court provided a framework for the legislature to construct a bill that would pass constitutional muster. The bill also gave Logue's BRA considerable powers over the redevelopment project, allowing him to rapidly move forward with permit approvals and tax issues.[66][71] The turnpike–Prudential deal linked with the Logue and the BRA's new powers to move the project forward quickly quieted much of the remaining opposition to the new roadway and cemented the idea of air right development as an integral part of the turnpike moving forward.[73] By 1965, the Massachusetts Turnpike had been connected to the Central Artery, and the Prudential Center was on its way to completion; however, Callahan did not live to see this. On April 24, 1964, he died of a massive heart attack at his home.[74]

The year 1968 saw the beginning of the first major expansion of the turnpike after the completion of the Boston extension in 1965. While the original design of the roadway called for an eight-lane expressway along the majority of the route, it was only constructed as a four-lane roadway along most of its length until it reached the junction of Route 9 in Framingham, where the roadway expanded to six lanes. Starting in 1968, the highway from the I-84 interchange in Sturbridge to Route 9 was widened from its original four lanes to six; that widening project was completed around 1971. However, the mainline right-of-way was constructed to allow future expansion of the roadway, with most bridges over the highway built with the eight-lane roadway in mind, so few bridges had to be rebuilt when it was widened in the late 1960s.

Big Dig

[edit]

When designing the Central Artery/Tunnel Project (CA/T Project; Big Dig) in the 1970s and 1980s, the horror stories regarding urban renewal projects such as the construction of the old viaduct in the 1950s weighed heavy on the minds of Frederick P. Salvucci and his team. It was realized early on that the commonwealth could not just lay waste to parts of the city and pave them over; the state would have to ensure that construction would balance the needs of the highways against the livability of the city and neighborhoods the project would pass through. Mitigation efforts would be of utmost importance in moving ahead with the project.[75][76]

Governor Francis Sargent had shut down any ideas of further freeway construction within the Route 128 beltway in 1970, thereby canceling both the I-695 "inner belt" and the Southwest Corridor freeway projects, placing more emphasis on the already-completed Boston extension of I-90, the extension of I-93 into Boston, and the work to eventually depress Boston's Central Artery below ground level as the only unbuilt freeway-related construction projects "inside" of Route 128 that would be allowed to go forward.[77]

The notions of using existing rights of way or areas where neighborhood displacement would be minimized were applied to the second extension of the turnpike as part of the Big Dig. Salvucci deliberately planned to bring the East Boston Extension through areas with little or no occupancy or those properties already owned by the commonwealth. As a result, East Boston saw almost no takings of buildings or homes through eminent domain or the destruction of neighborhoods because construction was relegated to the then-unoccupied areas of the Seaport District and Logan International Airport. Like the first turnpike extension, the connection of the turnpike to East Boston was also designed to provide an economic stimulus to the city, this one to revitalize the desolate Seaport District.[76]

Diagram of the highway system in Downtown Boston before and after completion of the Big Dig

The MTA managed the Big Dig, which rerouted the elevated Central Artery into the O'Neill Tunnel through Downtown Boston, and extended the turnpike beyond its terminus at the Central Artery into the Ted Williams Tunnel and connected it to Route 1A beyond Logan International Airport. Construction began in 1991, and the final extension of the turnpike was opened in 2003.

It was for the financial needs of the project that the "Metropolitan Highway System" was created with the turnpike east of Route 128; the Ted Williams, Sumner, and Callahan tunnels under Boston Harbor; and I-93 from Southampton Street through the O'Neill Tunnel and the Zakim Bridge to the foot of the Tobin Bridge.[78] Finances for the Western Turnpike and the Boston Extension continue to be handled separately with this reorganization.

Ceiling collapse

[edit]
Boston traffic crawling over the closed Ted Williams Tunnel entrance during rush hour, one day after the ceiling collapse

In response to a fatality caused by the collapse of the ceiling of the eastbound I-90 connector tunnel approaching the Ted Williams Tunnel on July 10, 2006, and, in response to MTA Chair Matthew J. Amorello's refusal (at the time) to resign, Romney took legal steps to have Amorello forcibly removed as head of the MTA.[79] This effort culminated in Amorello's resignation on August 15, 2006. The next day, John Cogliano was sworn in as the new chair of the MTA by Romney.[80] On November 27, 2006, departing Attorney-General Thomas Reilly (Democrat) announced the state would launch a civil suit over the collapse of the ceiling in the Ted Williams Tunnel. The commonwealth sought to recover over $150 million (equivalent to $218 million in 2023[37]) from project manager Bechtel/Parsons Brinckerhoff, builder Modern Continental, and the manufacturer of the epoxy used to hold the ceiling bolts.[needs update][81][82][83][84]

Infill exits

[edit]

In addition to the exits opened during construction of the Boston Extension, two infill exits were opened between existing interchanges on the Western Turnpike. Exit 106 (former exit 11A) in Hopkinton connects the turnpike with I-495 and enables transit between northern New England and Cape Cod; it was opened in 1969.[85] Exit 94 (former exit 10A) in Millbury connects the turnpike to Route 146 and US 20 via the Route 20 Connector, which, in turn, facilitates movement between Worcester and Providence, Rhode Island; construction began in 1996 and was opened in 1998 before being completed in 1999.[86]

Air rights

[edit]
Star Market (briefly Shaw's Supermarket) was built over the turnpike in Newtonville.

Much of the air space ("air rights") over the Boston Extension has been leased to third parties for commercial development. This concept was originally designed to "knit together communities" that were divided by the new highway,[87] since the turnpike had been described as "wider and more divisive to the city" than the original Central Artery.[88] More recently, the income received from the leased air rights have been used for paying off the Big Dig.[88] There are 23 parcels of air space over the highway, the majority of which have not been developed.[89] Among other objectives, guidelines established by the "Civic Vision for Turnpike Air Rights in Boston" in 2000 recommend that the proposed use of the parcels "[foster] increased use and capacity of public transportation" and "[reinforce] the vitality and quality of life in adjacent neighborhoods".[90]

The Star Market (briefly renamed Shaw's Supermarket) in Newtonville is the earliest example of commercial construction over the turnpike. In the 1960s, the MTA intended to route the highway through the parking lot of the supermarket's previous location in the city; this alignment was ultimately approved by the SJC, under the condition that a replacement Star Market was allowed to be built above the turnpike.[91] Other projects developed through air rights include the Four Points by Sheraton in Newton,[92][93] the Copley Place shopping mall in Boston,[93][94] and the Prudential Center in Boston.[93][95] Proposals for future air rights projects include the mixed-use Fenway Center,[96] and an extension of the Boston University campus near Boston University Bridge.[97]

After four decades of no new developments, in August 2020, construction began on Parcel 12, and construction was expected to begin within the month at Fenway Center pending a final agreement with MassDOT,[98] leading to planned closure of one lane in each direction for a year.[99] Parcel 12[100] is between Newbury Street, Boylston Street, and the west side of Massachusetts Avenue and is expected to feature a 13-story citizenM hotel, a 20-story office tower (including the headquarters of CarGurus), a reconstructed bus shelter, a public park, street-level retail, and a new entrance to the Hynes Convention Center station of the Green Line subway.[98] The developer of Parcel 13, on the east side of Massachusetts Avenue along Boylston Street, submitted updated plans in February 2020, with 17 stories of condos, hotel, parking, and public space.[101] An approved plan for Parcel 15 (known as 1000 Boylston Street) was canceled by the developer in August, 2019,[102] with the dissolution resulting in a lawsuit.[103]

Future

[edit]

Proposed exits

[edit]

For decades, there has been discussion about a potential new interchange with Route 56 in Oxford. This new interchange would be located between exit 78 (old exit 9) in Sturbridge and exit 90 (old exit 10) in Auburn. Former Leicester selectman Thomas V. Brennan Jr. created the idea for this potential new exit in 1996, and he continued to advocate for the idea into the late 2000s.[104][105] In 2011, the Town of Oxford included the construction of a new interchange as a long-term recommendation in their municipal transportation plan; construction estimates were $60 million to $75 million (equivalent to $86.9 million to $100 million in 2023[37]).[106]

The construction of an exit between exit 10 (former exit 2) in Lee and exit 41 (former exit 3) in Westfield, separated by a 30-mile (48 km) gap, has been controversial since the 1960s.[107] The state conducted a study to determine the feasibility of such a project in 2018;[107] land occupied by a service plaza and a maintenance facility (both in Blandford) and Algerie Road in Otis have been suggested as locations for a potential exit.[108]

Allston interchange

[edit]

The "I-90 Allston Multimodal Project"[109] is a plan to replace a deteriorating viaduct in Allston by redeveloping the turnpike through the land of the former CSX Transportation's Beacon Park Yard, which is now owned by Harvard University,[110][111] along with improvements to the Massachusetts Bay Transportation Authority's Framingham/Worcester Line.[112][113] The preliminary design plan called for the turnpike to be realigned at-grade and off the existing viaduct, and for the adjacent Soldiers Field Road to be partially realigned onto a new viaduct above the turnpike and off of the existing at-grade roadbed. The design is of a considerably smaller footprint than the existing configuration; this would facilitate the construction of the proposed West Station and the expansion of Harvard University on land where the existing viaduct is located.[114] The design phase was expected to be completed in 2019 and with a planned ground breaking in 2020.[115]

In September 2021, after much public criticism of the viaduct and river impact during construction, a new final design was announced, which keeps the turnpike and Soldiers Field Road at-grade. In the narrowest portion of the project, known as the "throat", the Charles River Bike Path will be put on a boardwalk over the river, and roadway shoulders will be narrowed by a collective four feet for a short length to avoid any permanent filling of the river.[116][117] This significantly delayed the project, and, As of January 2022, preliminary design is in progress, and modified project permits need to be obtained; construction was expected to start in 2023 and last for 6–10 years.[118] As of October 2023, the project is undergoing the federal environmental permitting process, which will continue into 2024.[119] The project did not win a National Infrastructure Project Assistance Program (MEGA) competitive grant on its 2021 application[120] for $1.2 billion in federal funding, nor the $200 million applied for from the same program in 2023.[121]

I-495 interchange

[edit]

The "I-495/I-90 Interchange Improvements Project" is intended to realign exit 106 (former exit 11A) in Hopkinton, where the existing interchange (designed for the now-demolished toll plazas) is notoriously congested and accident-prone during rush hour and holiday travel times.[122] As of 2018, MassDOT is examining three design proposals, which have raised the suggestions of separate northbound/southbound I-495 exits and the extension of acceleration lanes through exit 111 (former exit 12) in Framingham. The project initially was estimated to cost between $296–413 million, and the design phase expected to be 25-percent complete by 2020.[123] In July 2019, MassDOT announced that the state would be moving ahead with preferred design for overhaul of I-495/Mass Pike interchange consisting of a series of "flyover ramps" that would eliminate the interweaving of traffic that causes bottlenecks and crashes at the interchange. The state expects that the construction would begin in 2022 and run through 2026 at an estimated cost of approximately $296.4 million.[124]

Government oversight

[edit]
The Massachusetts Turnpike near the Chicopee exit

Since 2001, the MTA had come under fire from state politicians in a fight for control of the quasistate agency. Beginning in 2001, former Massachusetts acting Governor Jane Swift (Republican) attempted to fire Christy Mihos, a former turnpike board member and Jordan Levy, the vice chair of the board.

Mihos and Levy had cast votes on the board to postpone a toll hike. Swift objected, saying such a delay was "fiscally irresponsible" and saying the two men "interfered with the effective daily management of the Authority".[125] Mihos and Levy refused to step down and sued Swift to retain their positions. The SJC ruled that the turnpike was "not part of the machinery of the government" and therefore not subject to Swift's decisions.[126]

Governor Mitt Romney, elected in 2002 during a fiscal crisis, ran on a political platform of streamlining state government and eliminating waste. Part of this was the elimination of the MTA. Romney wanted to fold the turnpike into the Massachusetts Highway Department (MassHighway), the state highway department, operated under the Executive Office of Transportation. A first step to this was to replace the chair of the board, Matthew J. Amorello, with someone loyal to the governor. The governor has the power to appoint members to the board, but the SJC advised in an advisory opinion that "nothing in G. L. c. 81A explicitly provides for the removal and reassignment of the chairperson to the position of 'member'".[127][128]

Romney put pressure on Amorello to step down. Amorello announced he would do so in 2007, after Romney would have left office. Romney continued to press the legislature to give him the power to remove members from the board, specifically the chairman, pointing to a series of financial and construction mishaps over the last several years. However, the legislature instead sought to keep Amorello on board by extending the terms of various board members to prevent Romney from removing Amorello.[129]

Under a plan to save state funds, the Massachusetts Registry of Motor Vehicles (RMV) announced plans to close eleven of its branches in leased locations and move the operations into facilities owned by MassHighway and the MTA located in toll plazas, visitor centers, and offices. RMV branch closings were planned for Framingham, Lowell, North Attleborough, Cambridgeside Galleria Mall in Cambridge, New Bedford, Eastfield Mall in Springfield, Southbridge, Falmouth, Eastham, Beverly, and Boston.[130] Also, a portion of the newly increased sales tax in the state averted a planned toll increase. The MTA will receive approximately $100 million from the state general fund over the next few years, alleviating the need for the toll hike.[131]

Under legislation signed into law by Governor Deval Patrick on June 26, 2009, the turnpike was folded into a new superagency that controls all surface transportation in the state. The new agency, MassDOT, operates all highways formerly under MassHighway and the MTA as well as eight urban roadways formerly owned and maintained by the state Department of Conservation and Recreation (DCR).[132] In addition, MassDOT oversees the RMV, the Massachusetts Bay Transportation Authority (MBTA), regional transit authorities, and the state aeronautics commission.[133] The new transportation department began operations on November 1, 2009.[134][failed verification]

The MTA also owned the Callahan and Sumner tunnels, the other two road connections between Downtown Boston and East Boston under Boston Harbor.[135] Upon completion of the Big Dig, including the O'Neill Tunnel segment of I-93, were transferred to its control.[136] The authority received no state or federal government funding. Its revenues came from tolls, leases on air rights and service areas, and advertising. Its assets were all transferred to the new MassDOT agency as part of the restructuring of agencies.[137]

Highway shield

[edit]
Original logo
Previous incarnation of the pilgrim hat, seen on a shield for the Sumner Tunnel

The original logo depicted Paul Revere on horseback with the words "Massachusetts Turnpike Authority" in a circle around him. One incarnation of the pilgrim hat shield had a Native-American arrow sticking through the pilgrim hat. It was replaced with a plain pilgrim hat and the words "Mass Pike" in 1989. It has been reported variously that the sign was changed due to confusion among motorists who sometimes mistakenly turned in the direction the arrow pointed (right) when attempting to enter the turnpike[138] or that it was the result of a letter campaign describing the signs as offensive to Native Americans.[139]

According to MTA board member Mary Z. Connaughton's blog entry for the Boston Herald, all of the pilgrim-hat signage unique to the turnpike will be eliminated.[140] However, in a personal correspondence with AARoads.com's road blog, a MassDOT official said that usage of the hat would actually increase. When guide signs on I-95 and I-495 are replaced, the "Mass Pike" signage will be replaced with pilgrim hat shields.[141]

Exit list

[edit]

While Massachusetts has used sequential exit numbers since 1964,[142] the 2009 edition of the Manual on Uniform Traffic Control Devices required that all US states submit plans to transition to milepost-based exit numbering by 2012.[143] All exits on the turnpike were expected to be renumbered following this convention with two sign replacement projects scheduled for completion by 2018; the contractors were ultimately instructed to install the new signs with the existing numbers, albeit with wider exit tabs that would accommodate larger two- and three-digit exit numbers should the conversion take place in the future.[144] In November 2019, MassDOT announced that statewide milepost-based exit renumbering would begin in Western Massachusetts in summer 2020.[145] The work began along I-90 during the week of December 13, 2020, starting from Weston (I-95) and working westward before renumbering the exits inside I-95 and toward the airport.[146] The work was completed in one month.[147]


CountyLocation[148]mi[148]kmOld exitNew exit[149]Destinations[149]Notes
BerkshireWest Stockbridge0.0000.000


I-90 west / Berkshire Connector west to I-87 / New York Thruway – Albany
Continuation into New York
2.7364.40313 Route 41 / Route 102 – West StockbridgeWestbound exit and eastbound entrance
Lee8.513.7Lee Service Plaza
10.0116.11Lee Toll Gantry[42]
10.59217.046210
US 20 / Route 102 west – Lee, Pittsfield
Route 102 not signed
HampdenBlandford26.2542.25Blandford Toll Gantry[42]
29.046.7Blandford Service Plaza
Westfield40.43465.072341 US 202 / Route 10 – Westfield, Northampton
40.8665.76Westfield Toll Gantry[42]
West Springfield45.74073.611445
US 5 to I-91 – Springfield, Holyoke
Chicopee49.04178.924549 Route 33 – Chicopee, Holyoke
51.15482.324651
I-291 west – Springfield, Hartford, CT
Northern terminus and exit 7 on I-291
Ludlow54.78088.160754 Route 21 – Ludlow, Belchertown
55.689.5Ludlow Service Plaza
57.6892.83Ludlow Toll Gantry[42]
Palmer62.641100.811863 Route 32 – Palmer, WareTo US 20
WorcesterWarren69.78112.30Warren Toll Gantry[42]
Sturbridge78.300126.012978
I-84 west – Hartford, CT, New York City
Eastern terminus of I-84; former I-86
Charlton80.3129.2Charlton Service Plaza (eastbound)
83.1133.7Charlton Toll Gantry[42]
83.8134.9Charlton Service Plaza (westbound)
Auburn90.049144.9201090


I-290 east / I-395 south / US 20 east / Route 12 – Worcester, New London, CT
US 20 not signed; exit 12A on I-290
Millbury93.642150.70210A94 US 20 / Route 146 (Route 122A) – Millville, Providence, RIExit 18 on Route 146
96.343155.0491196 Route 122 – Millbury, WorcesterTo Route 30 and Route 140
Westborough104.6168.3Westborough Service Plaza (westbound only)
MiddlesexHopkinton104.86168.76Hopkinton Toll Gantry[42]
106.236170.97011A106 I-495 – Portsmouth, NH, TauntonExit 58 on I-495
WorcesterSouthborough109.07175.53Southborough Toll Gantry[42]
MiddlesexFramingham111.181178.92812111 Route 9 – Framingham, Southborough
113.92183.34Framingham Toll Gantry[42]
114.4184.1Framingham Service Plaza (westbound only)
116.600187.65013117 Route 30 – Natick, Framingham
Natick117.6189.3Natick Service Plaza / Fast Lane Service Center (eastbound only)
Weston120.21193.46Weston Toll Gantry[42]
122.600–
123.458
197.306–
198.686
14 (EB)
15 (WB)
123 I-95 (Route 128) / Route 30 – Waltham, Weston, Portsmouth, NH, Providence, RISigned as exits 123A (I-95) and 123B (Route 30) westbound; Route 30 not signed eastbound; exit 39B on I-95
Newton125.207201.50116125 Route 16 – West Newton, WellesleyWestbound exit and eastbound entrance
126.18203.07Newtonville Toll Gantry[42]
127.553205.27717127Newton, WatertownAccess via Washington Street
SuffolkBoston130.04209.28Brighton Toll Gantry[42]
130.991210.81018 (EB)
20 (WB)
131Allston–Brighton, CambridgeLeft eastbound exit; access via Cambridge Street
U-turn to BostonWestbound U-turn only; shared ramp with exit 131
131.15211.07Allston Toll Gantry[42]
132.863213.82221 Route 2A (Massachusetts Avenue)Westbound entrance only
132.889213.864West end of Prudential Tunnel
133.344214.59622133Prudential Center, Copley SquareEastbound exit and westbound entrance; access via Dartmouth Street; to Route 9 west
133.576214.97022AClarendon StreetFormer westbound entrance only; permanently closed on September 3, 2019[150]
133.586214.986East end of Prudential Tunnel
133.876215.45323Arlington StreetWestbound entrance only
134.315216.15924A134ASouth StationEastbound exit only; access via Atlantic Avenue
24134 I-93 (US 1 / Route 3) – Concord, NH, QuincySigned as exits 134B (north) and 134C (south) eastbound; exit 16A on I-93
134.275216.095Fort Point Channel Tunnel under Fort Point Channel
134.773216.89625135South BostonAccess via Congress Street
136219Ted Williams Tunnel[42] under Boston Harbor
137.239220.86526137 Logan AirportEastbound exit only
138.15222.33
Route 1A north – Revere
Eastern terminus of I-90
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

[edit]
  1. ^ "State Numbered Routes with Milepoints in District 4" (PDF). Commonwealth of Massachusetts. Archived from the original (PDF) on July 19, 2011. Retrieved June 21, 2017.
  2. ^ "Hazardous material route designation". Mass.gov. Archived from the original on January 16, 2018. Retrieved January 15, 2018.
  3. ^ "Open Road Toll Structure Now On Mass Pike In Weston". WBZ-TV. January 4, 2016. Archived from the original on November 26, 2017. Retrieved June 19, 2017.
  4. ^ a b c d e Cambridge Systematics (January 28, 2010). "Massachusetts Turnpike: Metropolitan Highway System" (PDF). Massachusetts Department of Transportation. Archived from the original (PDF) on October 20, 2015. Retrieved June 19, 2017.
  5. ^ "Massachusetts SuperGraphic". U-Haul. Archived from the original on April 5, 2018. Retrieved February 17, 2023.
  6. ^ Adderly, Kevin (January 15, 2014). "Table 3: Interstate Routes in Each of the 50 States, District of Columbia, and Puerto Rico". Route Log and Finder List. Federal Highway Administration. Archived from the original on April 30, 2014. Retrieved May 20, 2014.
  7. ^ "Eisenhower Interstate Highway System, Previous Facts of the Day - 50th Anniversary - Interstate System". Highway History. Federal Highway Administration. February 27, 2019. Archived from the original on August 8, 2020. Retrieved August 20, 2021.
  8. ^ O'Brien, Tim (March 25, 2010). "Thruway connector's name spurs question". Times Union. Hearst Corporation. Archived from the original on July 18, 2016. Retrieved June 19, 2017.
  9. ^ a b c d e f g h "I-90: Massachusetts Turnpike" (PDF). Central Transportation Planning Staff. Archived (PDF) from the original on December 29, 2019. Retrieved June 19, 2017.
  10. ^ a b c d e f "Travel Activities". Massachusetts Department of Transportation. Archived from the original on June 14, 2017. Retrieved June 19, 2017.
  11. ^ Sacharczyk, Tamara (May 17, 2016). "Hilltown residents pushing for new Mass Pike exit". WWLP. Archived from the original on October 23, 2017. Retrieved June 21, 2017.
  12. ^ Carey, Anne (August 13, 2011). "Top 16 longest gaps between Interstate exits". USA Today. Archived from the original on June 30, 2017. Retrieved June 21, 2017.
  13. ^ Vanhoenacker, Mark (August 18, 2014). "What Does This Beloved Road Sign on the Massachusetts Turnpike Actually Mean?". Slate. Archived from the original on July 7, 2017. Retrieved June 19, 2017.
  14. ^ "Runaway Truck Ramp". Flickr. September 9, 2017. Archived from the original on July 29, 2022. Retrieved July 20, 2018.
  15. ^ a b "Official Massachusetts Transportation Map". Massachusetts Department of Transportation. Archived from the original on June 24, 2018. Retrieved June 21, 2017.
  16. ^ "2015 Triennial Inspection: Metropolitan Highway System" (PDF). TranSystems. Archived from the original (PDF) on July 21, 2017. Retrieved June 22, 2017.
  17. ^ "Weston: Newly Constructed Ramp Opens Friday, June 23". Massachusetts Department of Transportation. June 22, 2017. Archived from the original on June 27, 2017. Retrieved June 27, 2017.
  18. ^ a b c d e f "I-90: Mass Turnpike (Route 16, Newton, to Route 1A, East Boston)" (PDF). Central Transportation Planning Staff. Archived (PDF) from the original on December 29, 2019. Retrieved June 22, 2017.
  19. ^ Estes, Andrea (September 10, 2007). "Pike U-turn ramp opening delayed". The Boston Globe. Archived from the original on October 26, 2018. Retrieved June 22, 2017.
  20. ^ Sweet, Laurel (March 26, 2017). "Man killed as car goes airborne in Pru tunnel". Boston Herald. Archived from the original on June 8, 2017. Retrieved June 22, 2017.
  21. ^ "Tunnels & Bridges". Massachusetts Department of Transportation. Archived from the original on June 22, 2017. Retrieved June 22, 2017.
  22. ^ "Travel Service Plazas & Tourist Information Center". Massachusetts Department of Transportation. Archived from the original on June 28, 2017. Retrieved June 20, 2017.
  23. ^ Mullan, Jeffrey (December 13, 2010). "Transportation Budget in Plain Language Explanation of MassDOT Funding Sources". Massachusetts Department of Transportation. Archived from the original on March 3, 2016. Retrieved June 21, 2017.
  24. ^ Fanto, Clarence (July 30, 2013). "Update: Westernmost Pike tolls will return, but how much will they be?". The Berkshire Eagle. Archived from the original on December 14, 2019. Retrieved June 21, 2017.
  25. ^ "Western Mass. tolls set to be restored". The Boston Globe. October 13, 2013. Archived from the original on October 14, 2013. Retrieved June 21, 2017.
  26. ^ Kriss, Eric (October 18, 2006). "Turnpike Task Force Final Report" (PDF). Turnpike Task Force. Archived from the original (PDF) on July 17, 2011. Retrieved June 21, 2017.
  27. ^ Misrha, Raja; Daniel, Mac (October 29, 2006). "Pike board acts to end tolls west of Route 128". The Boston Globe. Archived from the original on August 8, 2016. Retrieved June 21, 2017.
  28. ^ Daniel, Mac (October 10, 2006). "Ending Pike tolls is called illegal". The Boston Globe. Archived from the original on March 3, 2016. Retrieved June 21, 2017.
  29. ^ Johnson, Glen. "Patrick Planning to Dismantle Mass. Turnpike". MetroWest Daily News. Framingham, Massachusetts. Associated Press. Archived from the original on April 23, 2021. Retrieved April 23, 2021.
  30. ^ a b Thompson, Elaine (January 23, 2016). "All-Electronic Tolling Begins Installation on Mass. Pike". Telegram & Gazette. Worcester, Massachusetts. Archived from the original on September 1, 2016. Retrieved September 5, 2016.
  31. ^ Finucane, Martin (January 21, 2009). "Fast Lane transponders will be free, but users will see a new fee". The Boston Globe. Archived from the original on January 24, 2009. Retrieved April 3, 2010.
  32. ^ Bierman, Noah (April 22, 2009). "After Easter snafus, Pike puts toll taker layoffs on hold". The Boston Globe. Archived from the original on April 25, 2009. Retrieved April 3, 2010.
  33. ^ "Fast Lane Transponders Are Now Fee Free". WBZ-TV. Archived from the original on April 28, 2009. Retrieved August 6, 2009.
  34. ^ Burke, Isaac (July 1, 2016). "Mass Pike prepares to phase out toll booths". Daily Hampshire Gazette. Archived from the original on December 8, 2016. Retrieved June 22, 2017.
  35. ^ Chesto, Jon (May 10, 2012). "Massachusetts pulls out of the Fast Lane in favor of E-ZPass". Wicked Local. Archived from the original on June 11, 2017. Retrieved June 22, 2017.
  36. ^ a b Flint, Anthony (October 24, 2003). "Turnpike users may get a free toll device". The Boston Globe. Archived from the original on February 22, 2018. Retrieved June 22, 2017.
  37. ^ a b c d e f g Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  38. ^ "Mass. Pike Electronic Tolling: What You Should Know". CBS Boston. October 27, 2016. Archived from the original on June 9, 2017. Retrieved June 22, 2017.
  39. ^ O'Connell, Scott (June 16, 2012). "Mass Pike says goodbye to 'Fast Lane'". The MetroWest Daily News. GateHouse Media. Archived from the original on February 22, 2018. Retrieved June 22, 2017.
  40. ^ Baker, Cynthia (August 13, 2014). "Raytheon Awarded $130 Million to Convert Massachusetts to Electronic Highway Tolling System" (Press release). Raytheon. Archived from the original on May 7, 2017. Retrieved September 5, 2016.
  41. ^ Dummies, Gintautas (June 7, 2016). "New Mass. Pike Electronic Tolling: Will There Be Any Cost Savings from Eliminating Toll Plazas?". MassLive. Archived from the original on August 10, 2016. Retrieved August 9, 2016.
  42. ^ a b c d e f g h i j k l m n o p q r s "All Electronic Tolling". Massachusetts Department of Transportation. Archived from the original on October 28, 2016. Retrieved June 6, 2017.
  43. ^ Dummies, Gintautas (July 27, 2016). "New Mass. Pike Toll Rate Structure Expected to Be Released in August". MassLive. Archived from the original on August 10, 2016. Retrieved August 9, 2016.
  44. ^ Highway Division (2016). "Pay By Plate MA". Massachusetts Department of Transportation. Archived from the original on September 7, 2016. Retrieved September 5, 2016.
  45. ^ McKay, David (July 19, 2016). "'Open Road Tolling Coming Soon: Time to Get an E-ZPass". Chicopee, Massachusetts: WWLP-TV. Archived from the original on August 9, 2016. Retrieved August 9, 2016.
  46. ^ Highway Division (August 22, 2016). "All Electronic Tolling: Toll Plaza Demolition and Roadway Reconstruction" (PDF). Massachusetts Department of Transportation. Archived from the original (PDF) on August 24, 2016. Retrieved September 5, 2016.
  47. ^ Rocheleau, Matt (August 22, 2016). "How Much Will Your New Mass. Pike Toll Be?". The Boston Globe. Archived from the original on August 26, 2016. Retrieved September 5, 2016.
  48. ^ Bombard, Noah R. (July 19, 2016). "Yes, Those New Electronic Toll Gantries on the Mass. Pike Are Clocking Your Speed". MassLive. Archived from the original on August 10, 2016. Retrieved August 9, 2016.
  49. ^ Rocheleau, Matt (August 22, 2016). "New Mass. Gantries Can Send Authorities Alerts". The Boston Globe. Archived from the original on August 25, 2016. Retrieved September 5, 2016.
  50. ^ Tsipis, Yanni (2002). Building the Mass Pike. Mount Pleasant, South Carolina: Arcadia Publishing. pp. 9–10. ISBN 0738509728.
  51. ^ Berkman, Toby (1998). Six Lanes, Five Miles, a Decade of Construction. The Concord Review. p. 200.
  52. ^ Tsipis (2002), pp. 7–8.
  53. ^ a b c "Baystate Notes Spending Record". The New York Times. November 5, 1958.[page needed]
  54. ^ Tsipis, Yanni (2003). Building 128. Mount Pleasant, South Carolina: Arcadia Publishing. pp. 8–9. ISBN 0738511633.
  55. ^ Tsipis (2002), pp. 27–28.
  56. ^ Massachusetts Turnpike Authority (1957). Building the Massachusetts Turnpike (Film). OCLC 24802486. Retrieved November 11, 2023.
  57. ^ Berkman (1998), pp. 180–181
  58. ^ Tsipis (2002), pp. 27–29.
  59. ^ Kennedy, Lawrence (1994). Planning the City Upon a Hill: Boston Since 1630 (3rd ed.). Boston: University of Massachusetts Press. p. 168. ISBN 0870239236.
  60. ^ a b Tsipis (2002), pp. 47–48.
  61. ^ Britten[full citation needed]
  62. ^ Berkman (1998), pp. 170–173
  63. ^ Berkman (1998), pp. 177–181
  64. ^ Fenton[full citation needed]
  65. ^ Lovett, Laura. "African-American community of Newton has long legacy". Newton TAB. Archived from the original on January 22, 2021. Retrieved December 11, 2020.
  66. ^ a b c d e f Aloisi, James (October 3, 2013). "Collins and Logue: a formidable team". CommonWealth Magazine. Archived from the original on September 11, 2014. Retrieved September 11, 2014.
  67. ^ Kennedy (1994), pp. 172–173.
  68. ^ Aloisi, James (October 26, 2013). "The New Boston was a mix of good and bad". CommonWealth Magazine. Archived from the original on September 11, 2014. Retrieved September 11, 2014.
  69. ^ Kennedy (1994), p. 172.
  70. ^ a b Berkman (1998), pp. 188
  71. ^ a b c d Lewis, Anthony (June 20, 1961). "Massachusetts Turnpike Chief Criticized in Rising Scandals". The New York Times. p. 1. Archived from the original on September 22, 2019. Retrieved August 5, 2020.
  72. ^ Tsipis (2002), p. 48.
  73. ^ Berkman (1998), pp. 188–189
  74. ^ Funeral[full citation needed]
  75. ^ DOT[full citation needed]
  76. ^ a b Altshuler, p. 95–96.[full citation needed]
  77. ^ "Great Projects: The Building of America . Interviews | PBS". www.pbs.org. Archived from the original on August 7, 2016. Retrieved August 5, 2020.
  78. ^ "MGL Chapter 81A, Section 3". Archived from the original on July 26, 2010. Retrieved February 21, 2009.
  79. ^ Lehigh, Scot (July 14, 2006). "Amorello, now adrift". The Boston Globe. Archived from the original on September 7, 2008. Retrieved August 20, 2008.
  80. ^ "Cogliano Sworn In as New Turnpike Chief". WCVB-TV. August 16, 2006. Archived from the original on September 30, 2007. Retrieved October 27, 2009.
  81. ^ Herbst, Svea (November 28, 2006). "Mass. to sue Big Dig firms over tunnel accident". Reuters. Archived from the original on December 5, 2019. Retrieved December 5, 2019.
  82. ^ Murphy, Sean P.; Estes, Andrea (July 11, 2007). "Wide risk, wide blame". The Boston Globe. Archived from the original on July 25, 2012. Retrieved October 9, 2009.
  83. ^ Saltzman, Jonathan (November 15, 2008). "Companies to settle for $26m in tunnel collapse". The Boston Globe. Archived from the original on October 24, 2012. Retrieved October 9, 2009.
  84. ^ Finucane, Martin (March 27, 2009). "AG settles with final two firms in fatal collapse of Big Dig tunnel". The Boston Globe. Archived from the original on March 28, 2009. Retrieved October 9, 2009.
  85. ^ "Historic Overview". Boston Roads. Archived from the original on April 18, 2019. Retrieved April 18, 2019.
  86. ^ "Worcester's Link to the MassPike: An Update on the Route 146 Connector" (PDF). Worcester Regional Research Bureau. May 15, 2003. Archived (PDF) from the original on April 18, 2019. Retrieved April 18, 2019.
  87. ^ "Why Develop Air Rights" (PDF). The Boston Informer. Archived (PDF) from the original on September 25, 2018. Retrieved June 21, 2017.
  88. ^ a b "Mass Pike Air Rights". The Boston Globe. Archived from the original on October 28, 2016. Retrieved June 21, 2017.
  89. ^ ARCH 7130 Research Studio (March 14, 2013). "Air Rights by Northeastern School of Architecture". Issuu. Archived from the original on December 13, 2014. Retrieved June 21, 2017.{{cite web}}: CS1 maint: numeric names: authors list (link)
  90. ^ "Civic Vision for Turnpike Air Rights in Boston". Boston Redevelopment Authority. March 3, 2003. Archived from the original on February 3, 2004. Retrieved June 21, 2017.
  91. ^ Herwick III, Edgar (May 24, 2017). "How Did That Star Market End Up Over The Massachusetts Turnpike?". WGBH. Archived from the original on June 24, 2017. Retrieved June 21, 2017.
  92. ^ "Sheraton over Mass Pike becomes a Crowne Plaza". The Boston Globe. June 26, 2009. Archived from the original on August 6, 2017. Retrieved June 21, 2017.
  93. ^ a b c DePaola, Frank (March 15, 2013). "Tunnel Inspection and Testing Protocol For Roadways Covered by Air Rights Developments" (PDF). Massachusetts Department of Transportation. Archived from the original (PDF) on July 21, 2017. Retrieved June 21, 2017.
  94. ^ Palmer, Thomas (March 19, 2006). "Building on the Pike". The Boston Globe. Archived from the original on August 6, 2017. Retrieved June 21, 2017.
  95. ^ Treffeisen, Beth (October 28, 2016). "Project Over Turnpike Moves Closer to Reality". Beth Treffeisen Photography. Archived from the original on August 6, 2017. Retrieved June 21, 2017.
  96. ^ Acitelli, Tom (October 24, 2016). "Fenway Center could finally get going next year". Curbed. Archived from the original on August 6, 2017. Retrieved June 21, 2017.
  97. ^ "BU says campus future is up in the air". The Daily Free Press. Boston University. May 6, 2008. Archived from the original on July 24, 2011. Retrieved June 21, 2017.
  98. ^ a b "It's been 40 years since someone has built over the Mass. Pike. Until now". The Boston Globe. Archived from the original on August 14, 2020. Retrieved August 24, 2020.
  99. ^ "Get Ready For A Year Of Traffic Restrictions On The Pike Through Back Bay". www.wbur.org. Archived from the original on August 24, 2020. Retrieved August 24, 2020.
  100. ^ "Parcel 12 | Boston Planning & Development Agency". Archived from the original on August 5, 2020. Retrieved August 24, 2020.
  101. ^ Acitelli, Tom (February 10, 2020). "Massachusetts Turnpike project at Boylston Street and Mass. Ave. comes back to life". Curbed Boston. Archived from the original on October 25, 2020. Retrieved August 24, 2020.
  102. ^ Acitelli, Tom (August 19, 2019). "Back Bay's 1000 Boylston Street a no-go over the Massachusetts Turnpike". Curbed Boston. Archived from the original on October 12, 2020. Retrieved August 24, 2020.
  103. ^ "A desperate plea to save a development project: 'Who is ever going to trust me again?'". The Boston Globe. Archived from the original on July 14, 2020. Retrieved August 24, 2020.
  104. ^ Lilyestrom, Betty (March 6, 2008). "State urged to consider new Pike exit". Telegram & Gazette. Worcester, Massachusetts. Archived from the original on February 26, 2023. Retrieved February 26, 2023.
  105. ^ Lilyestrom, Betty (January 9, 2008). "Pike entrance proposal for Route 56 resurrected". Telegram & Gazette. Worcester, Massachusetts. Archived from the original on February 26, 2023. Retrieved February 26, 2023.
  106. ^ "Oxford Transportation Plan" (PDF). Town of Oxford, Massachusetts. April 2011. Archived (PDF) from the original on February 26, 2023. Retrieved February 26, 2023.
  107. ^ a b Kinney, Jim (May 9, 2018). "Exit 2.5 next right: Where could a new Massachusetts Turnpike exit go between Westfield and Lee?". MassLive. Archived from the original on July 21, 2018. Retrieved July 20, 2018.
  108. ^ Kinney, Jim (September 11, 2018). "MassDOT narrows possible sites for new Massachusetts Turnpike exit". MassLive. Archived from the original on September 20, 2018. Retrieved September 19, 2018.
  109. ^ Murray, Timothy P. (September 6, 2020). "State must get Pike project right for Central Mass". Telegram & Gazette. Worcester, Massachusetts. Archived from the original on June 22, 2021. Retrieved June 16, 2022.
  110. ^ Delawala, Imtiyaz H. (June 30, 2000). "University Wins Land Auction With $151M Bid". The Harvard Crimson. Archived from the original on June 13, 2022. Retrieved June 16, 2022.
  111. ^ Dyer, John (February 14, 2011). "Land at a premium, railroad exploits its air space". The Boston Globe. Archived from the original on March 8, 2022. Retrieved June 16, 2022.
  112. ^ "Allston Multimodal Project". Massachusetts Department of Transportation. Archived from the original on January 9, 2020. Retrieved January 10, 2020.
  113. ^ Sperance, Cameron (October 12, 2017). "Harvard's Boston Real Estate Move Has Made It 'An Allston University With A Cambridge Campus'". Bisnow. Archived from the original on June 29, 2018. Retrieved June 28, 2018.
  114. ^ Vaccaro, Adam (January 10, 2019). "Mass. Pike in Allston, Soldiers Field Road are set for a major overhaul". The Boston Globe. Archived from the original on January 21, 2019. Retrieved January 20, 2019.
  115. ^ "I-90 Allston Interchange Improvement Project Update". Massachusetts Department of Transportation. November 14, 2017. Archived from the original on June 25, 2018. Retrieved June 28, 2018.
  116. ^ Lisinski, Chris (September 30, 2021). "At-Grade Option Recommended For Allston Megaproject". Boston: WBUR-FM. State House News Service. Archived from the original on January 7, 2022. Retrieved April 12, 2022.
  117. ^ Mohl, Bruce (September 29, 2021). "State embraces all-at-grade Allston project". Archived from the original on January 7, 2022. Retrieved January 7, 2022.
  118. ^ "About the Allston Multimodal Project". Massachusetts Department of Transportation. Archived from the original on January 3, 2022. Retrieved January 7, 2022.
  119. ^ "Allston Multimodal Project | Mass.gov". www.mass.gov. Retrieved October 22, 2023.
  120. ^ Massachusetts Department of Transportation (May 23, 2022). "I-90 Allston Multimodal Project: FY 2022 Multimodal Project Discretionary Grant Application".
  121. ^ MassDOT’s Allston I-90 Plans Suffer Another Rejection for Federal Funding
  122. ^ "Project background: I-495/I-90 interchange improvements". Massachusetts Department of Transportation. Archived from the original on April 20, 2019. Retrieved April 19, 2019.
  123. ^ Phelps, Jonathan (October 10, 2018). "Three designs for turnpike/495 interchange rise to the top". Telegram & Gazette. Worcester, Massachusetts. Archived from the original on April 20, 2019. Retrieved April 19, 2019.
  124. ^ Malachowski, Jeff (July 26, 2019). "State officials unveil preferred design for overhaul of I-495-Mass Pike interchange". Telegram & Gazette. Worcester, Massachusetts. Archived from the original on March 26, 2020. Retrieved January 10, 2020.
  125. ^ "Jordan Levy & another vs. the Acting Governor & another". November 19, 2001. Archived from the original on July 9, 2012. Retrieved July 13, 2007.
  126. ^ "Jordan Levy & another vs. the Acting Governor & another SJC-08730". May 7, 2002. Archived from the original on October 18, 2015. Retrieved July 2, 2007.
  127. ^ "Answer of the justices to the governor". June 29, 2005. Archived from the original on May 15, 2011. Retrieved July 2, 2007.
  128. ^ "Request for Advisory Opinion, A-108 SJC-09461". June 29, 2005. Archived from the original on October 18, 2015. Retrieved July 2, 2007.
  129. ^ Murphy, Sean P. (June 2, 2006). "Budget amendment in Senate would let Amorello keep job". The Boston Globe. Archived from the original on June 14, 2006. Retrieved August 21, 2008.
  130. ^ Riley, David Riley (July 3, 2009). "Registry to close Framingham branch, 10 other locations". The MetroWest Daily News. Retrieved August 1, 2009.
  131. ^ "Masspike toll hike scrapped". WWLP. Associated Press. June 29, 2009. Archived from the original on September 27, 2011. Retrieved August 1, 2009.
  132. ^ "Chapter 25 of the Acts of 2009". The 186th General Court of The Commonwealth of Massachusetts. Archived from the original on October 7, 2012. Retrieved November 5, 2009.
  133. ^ "Governor Patrick signs bill to dramatically reform transportation system". Commonwealth of Massachusetts. June 26, 2009. Archived from the original on June 30, 2009. Retrieved August 1, 2009.
  134. ^ "About Us". Commonwealth of Massachusetts. Archived from the original on September 13, 2018. Retrieved November 3, 2009.
  135. ^ Office of Transportation Planning (January 12, 2007). Jurisdiction of Roads in District 4 (PDF) (Map). 1:95,040. Boston: Massachusetts Executive Office of Transportation. Archived from the original (PDF) on June 15, 2007.
  136. ^ "The Big Dig". Archived from the original on December 13, 2009. Retrieved October 4, 2014.
  137. ^ Schworm, Peter (October 16, 2009). "End of the road for Mass. Pike". The Boston Globe. Archived from the original on July 23, 2012. Retrieved November 3, 2009.
  138. ^ Montgomery, M. R. (February 28, 1991). "Redrawing the Native American Image". The Boston Globe. p. 69. Archived from the original on July 18, 2014. Retrieved April 3, 2010. Too many tourists, non-English readers and reflexive drivers were always turning right, following the politically incorrect arrow to nowhere.
  139. ^ Bazinet, Kenneth R. (November 22, 1989). "Mass. Turnpike to Change Logo: Teacher, Class Get Arrow Out of Pilgrim's Hat". Schenectady Gazette. p. A8. Archived from the original on July 29, 2022. Retrieved December 25, 2019 – via Google News.
  140. ^ Connaughton, Mary Z. (July 21, 2009). "Hats off, Governor". Boston Herald. Archived from the original on September 18, 2012. Retrieved August 1, 2009.
  141. ^ "Mass Turnpike Authority to be absorbed by new Mass Surface Trans Authority". Archived from the original on October 6, 2014. Retrieved October 4, 2014.
  142. ^ Clauss, Kyle Scott (April 8, 2016). "Many Massachusetts Highway Exit Numbers Could Soon Change". Boston Magazine. Archived from the original on June 29, 2018. Retrieved June 28, 2018.
  143. ^ Thompson, Elaine (March 19, 2016). "Watchdog Report: No signs yet from state on exit-conversion launch". Telegram & Gazette. Worcester, Massachusetts. Archived from the original on June 29, 2018. Retrieved June 28, 2018.
  144. ^ Malme, Robert H. "Misc. Massachusetts Highway Photos: MassDOT Exit Renumbering Project 2016". Massachusetts Highways for the 21st Century. Archived from the original on March 5, 2016. Retrieved July 13, 2018.[self-published source]
  145. ^ "Milepost-based Exit Renumbering" (PDF). Massachusetts Department of Transportation. December 5, 2019. Archived (PDF) from the original on December 7, 2019. Retrieved December 5, 2019.
  146. ^ Levin, Jake (December 13, 2020). "MassDOT Exit Renumbering Project Begins Sunday". NBC Boston. Archived from the original on August 20, 2021. Retrieved August 20, 2021.
  147. ^ "Interactive Map: Mass Pike Exit Renumbering". Springfield, Massachusetts: WWLP. December 22, 2020. Archived from the original on August 20, 2021. Retrieved August 20, 2021.
  148. ^ a b Planning Division. "Massachusetts Route Log Application". Massachusetts Department of Transportation. Archived from the original on August 26, 2014. Retrieved August 22, 2014.
  149. ^ a b Massachusetts Department of Transportation. "Exit Numbers and Names: Route I-90 (West Stockbridge to Boston)". Massachusetts Department of Transportation. Archived from the original on May 27, 2016. Retrieved June 13, 2016.
  150. ^ "Crash-plagued Clarendon Street Mass Pike permanently closed". Boston: WCVB-TV. September 3, 2019. Archived from the original on September 3, 2019. Retrieved September 3, 2019.

Further reading

[edit]
[edit]
KML is from Wikidata


Interstate 90
Previous state:
New York
Massachusetts Next state:
Terminus